Installation Method

Base Jack

According to the scaffolding layout plan, position the adjustable base jacks at designated locations to serve as the foundational support points for the entire frame.

Starter Vertical Post

Insert the shorter end (approx. 350mm) of the starter vertical post into the base jack, ensuring the bottom is level and fully seated in the recess to form a stable initial vertical post.

First-Level Ledger

Insert both ends of the ledger into the minor holes of the disc, pressing it flush against the outer wall of the vertical post, then secure it with wedge pins to complete the first horizontal connection.

First-Level Vertical Post

 According to the scaffolding layout plan, continue inserting standard uprights onto the starter vertical post, progressively building the vertical framework upward.

Second-Level Ledger

Fix the second-level ledgers in sequence following the same installation method as the first level, further reinforcing the frame structure.

Diagonal Brace

 Install the diagonal braces sequentially in a diagonal orientation, inserting both ends into the major holes of the disc and securing with wedge pins to enhance overall stability.